Final Project: Plan of Attack

The plan for completing the project is as follows:

Sunday 4/22
Finalize List of Electronic Components and order them. (Accomplished)

Visit home depot to find hardware for contraptions body

Monday 4/23
Investigate possible code for programming device.

Wednesday 4/25
Electronic parts should arrive.
Begin testing with code.

Friday 4/27
Assemble frame and connect to arduino. Take video of this for benchfly.

Saturday 4/29
Run tests so I have time to tinker if it fails to work as desired. Work on instructible entry.

Sunday 4/30
Refine device if needed and take data for figshare.

Following week

Refine the code and make adjustments to the physical aspects of the device. Also, I hope to improve the aesthetics of the device.